Gateway Phase 2
Trail Construction
We are currently constructing 22 miles of multi-use, mountain bike optimized trails on the Shasta-Trinity National Forest in Mt. Shasta, CA. To find out more information about the project please visit the Mount Shasta Trail Association Gateway Phase 2 Project Page
South Fork Trail System
Planning, Design & Landscape Investigations
In 2021, Trail Labs Co was hired to plan and design a multi-use, mountain bike optimized trail system for inclusion in the U.S. Forest Service South Fork Sacramento Public Safety and Forest Restoration Project.
The goal of our work was to investigate the Phase 1 project area and determine if a high quality trail network was possible. If so, the next step was to develop and design an informed and accurate trail plan for environmental review.
The result was a 40 miles network of trails offering high alpine views, technical and flowing mountain biking opportunities, shuttle locations, and long traversing trail routes which connect multiple trailheads and destination landforms.
Colby Meadows Trail System
Planning, Design & Layout
Jonesville, CA.
- Spring 2021 -
Multi-Use Trail: PJ3 Ranch
Planning, Design, Layout & Construction
Redding, CA.
- Spring 2021 -
Hurdy Gurdy Trail System
Planning, Design & Layout
Smith River National Recreation Area, CA.
- Winter/Spring 2021 -
McKay Bike Park
Concept Design
Eureka, CA.
- Summer 2020 -
Gateway Phase 2
Trail Construction
Mt. Shasta, CA.
- Summer 2020 / Ongoing -
Bull Gap Road-to-Trail Conversion
Site Feasibility Study, Field Surveys, Plan Development
Ashland, OR.
- Summer 2020 -
Multi-Use Trail: PJ3 Ranch
Trail Design, Layout, & Construction
Redding, CA.
- Spring 2020 -
Beachfront Bike Park
Site Feasibility Study & Concept Design
Crescent City, CA.
- Winter 2019 / Spring 2020 -
Peavine OHV Maintenance
Grading, Recontouring, & Drainage Improvements
Reno, NV.
- Fall 2019 -
Lowden Bike Park: Phase 1
Pump Track Paving
Northern California
- Fall 2019 -
Gateway Trail: Phase 1 Re-Alignment
Planning & Location
Mt. Shasta, CA.
- Summer 2019 -
Shastice Bike Park: Phase 2
Conceptual Design & Planning
Mt. Shasta, CA.
- Summer 2019 -
U.S. Forest Service Trail Summit
Guest Speaker
+ Introduction to Sustainable Trails
+ Applied Trail System Planning
Mt. Shasta, CA.
- Summer 2019 -
Jefferson MTB Trails Summit
Instructor
+ Introduction to Sustainable Trails
+ Introduction to Trail Building & Maintenance
Redding, CA.
- Winter 2019 -
Photo: Mike Chapman - Record Searchlight
Lowden Bike Park: Phase 1
Pump Track Design, Layout, and Construction
Weaverville, CA
- Fall 2018 -
Talstation Kaiserbergbahn: MTB Flow Trail
Trail Design, Excavation, and Fine Grading
Bad Kleinkirchheim, Austria
- Summer 2018 -
Granite Basin OHV Area: Trail System Planning
Assessment, Inventory, and Relocation
Palmetto, CA.
- Summer 2018 -
Gateway Trail: Maintenance & Upgrades
Inventory, Design, Construction, and Restoration
Mt. Shasta, CA.
- Spring 2018 -
Trails Training Workshop
Instructor
+ Introduction to Sustainable Trails
+ Trail System Planning & Design
+ Introduction to Trail Maintenance
Chico, CA.
- Spring 2018 -
Shoshone OHV Area: Trail Maintenance & Upgrades
Grading & Restoration
Battle Mountain, NV.
- Spring 2018 -
California Trails & Greenways Conference
Guest Speaker
Road-to-Trail Conversion: Problematic Road to Destination MTB Trail
Santa Rosa, CA.
- Spring 2018 -
Snail Trail: Trail Maintenance & Upgrades
Trail Design, Road-to-Trail Conversion, Excavation & Fine Grading
Redding, CA.
- Winter 2018 -
Gateway Phase 2: Trail System Planning
Trail Planning, Design, & Location
Mt. Shasta, CA.
- Fall 2017 -
Photo: Trevor Lyden
Alpine Baldy Trail: Trail Construction
Trail Location & Design, Road-to-Trail Conversion, Trail Excavation & Fine Grading, Restoration, and Hand Shaping
Skykomish, WA.
- Summer 2016 & Summer 2017 -
A Project of Evergreen Mountain Bike Alliance
Jump Line Trail: Maintenance & Upgrades
Trail Design, Excavation & Fine Grading, Hand Shaping, and Restoration
Lacks Creek, CA.
- Spring 2017 -
Lowden Park: Bike Park Master Plan
Site Assessment, Conceptual Design, Materials & Cost Estimates, Development Plan
Weaverville, CA.
- Spring 2017 -
Enticer Trail: Road-to-Trail Conversion
Planning, Design, Excavation & Fine Grading, Restoration
Redding, CA.
- Winter 2017 -