Gateway Phase 2

Gateway Phase 2

Trail Construction

We are currently constructing 22 miles of multi-use, mountain bike optimized trails on the Shasta-Trinity National Forest in Mt. Shasta, CA. To find out more information about the project please visit the Mount Shasta Trail Association Gateway Phase 2 Project Page


South Fork Trail System

Planning, Design & Landscape Investigations

In 2021, Trail Labs Co was hired to plan and design a multi-use, mountain bike optimized trail system for inclusion in the U.S. Forest Service South Fork Sacramento Public Safety and Forest Restoration Project.

The goal of our work was to investigate the Phase 1 project area and determine if a high quality trail network was possible. If so, the next step was to develop and design an informed and accurate trail plan for environmental review.

The result was a 40 miles network of trails offering high alpine views, technical and flowing mountain biking opportunities, shuttle locations, and long traversing trail routes which connect multiple trailheads and destination landforms.


Colby Meadows.png

Colby Meadows Trail System

Planning, Design & Layout

Jonesville, CA.

- Spring 2021 -


PJ3 Ranch.jpg

Multi-Use Trail: PJ3 Ranch

Planning, Design, Layout & Construction

Redding, CA.

- Spring 2021 -


Hurdy Gurdy Trail System.jpg

Hurdy Gurdy Trail System

Planning, Design & Layout

Smith River National Recreation Area, CA.

- Winter/Spring 2021 -


McKay Bike Park Concept Design, Eureka, CA.

McKay Bike Park

Concept Design

Eureka, CA.

- Summer 2020 -


Gateway Phase 2, Trail Construction, Mt. Shasta, CA.

Gateway Phase 2

Trail Construction

Mt. Shasta, CA.

- Summer 2020 / Ongoing -


Screen Shot 2020-10-13 at 8.38.54 AM.png

Bull Gap Road-to-Trail Conversion

Site Feasibility Study, Field Surveys, Plan Development

Ashland, OR.

- Summer 2020 -


Private Multi-Use Trail, Redding, CA.

Multi-Use Trail: PJ3 Ranch

Trail Design, Layout, & Construction

Redding, CA.

- Spring 2020 -


CC Bike Park - DRAFT DESIGN 100820.png

Beachfront Bike Park

Site Feasibility Study & Concept Design

Crescent City, CA.

- Winter 2019 / Spring 2020 -


Peavine OHV and Access Maintenance, Reno NV.

Peavine OHV Maintenance

Grading, Recontouring, & Drainage Improvements

Reno, NV.

- Fall 2019 -


DJI_0939 copy.JPG

Lowden Bike Park: Phase 1

Pump Track Paving

Northern California

- Fall 2019 -


Trail Labs Co - Gateway Phase 1 - Trail Realignment

Gateway Trail: Phase 1 Re-Alignment

Planning & Location

Mt. Shasta, CA.

- Summer 2019 -


Shastice Bike Park - Final.jpg

Shastice Bike Park: Phase 2

Conceptual Design & Planning

Mt. Shasta, CA.

- Summer 2019 -


Trail Labs Co - Shasta Trail Summit - 2019

U.S. Forest Service Trail Summit

Guest Speaker

+ Introduction to Sustainable Trails

+ Applied Trail System Planning

Mt. Shasta, CA.

- Summer 2019 -


Redding MTB Trail Summit.jpg

Jefferson MTB Trails Summit

Instructor

+ Introduction to Sustainable Trails

+ Introduction to Trail Building & Maintenance

Redding, CA.

- Winter 2019 -

Photo: Mike Chapman - Record Searchlight


Trail Labs Co - Bike Park - Weaverville

Lowden Bike Park: Phase 1

Pump Track Design, Layout, and Construction

Weaverville, CA

- Fall 2018 -


Trail Labs Co - Flow Trail - Bad Kleinkirchheim - Austria

Talstation Kaiserbergbahn: MTB Flow Trail

Trail Design, Excavation, and Fine Grading

Bad Kleinkirchheim, Austria

- Summer 2018 -


Trail Labs Co - Granite Basin OHV

Granite Basin OHV Area: Trail System Planning

Assessment, Inventory, and Relocation

Palmetto, CA.

- Summer 2018 -


Trail Labs Co - Gateway Trail - Maintenance - Mt. Shasta

Gateway Trail: Maintenance & Upgrades

Inventory, Design, Construction, and Restoration

Mt. Shasta, CA.

- Spring 2018 -


Trail Labs Co - Trail Class - Chico - Upper Bidwell Park

Trails Training Workshop

Instructor

+ Introduction to Sustainable Trails

+ Trail System Planning & Design

+ Introduction to Trail Maintenance

Chico, CA.

- Spring 2018 -


IMG_0293.JPG

Shoshone OHV Area: Trail Maintenance & Upgrades

Grading & Restoration

Battle Mountain, NV.

- Spring 2018 -


Trail Labs Co - Road to Trail Conversion - Redding

California Trails & Greenways Conference

Guest Speaker

Road-to-Trail Conversion: Problematic Road to Destination MTB Trail

Santa Rosa, CA.

- Spring 2018 -


Trail Labs Co - Snail Trail - Trail Reconstruction

Snail Trail: Trail Maintenance & Upgrades

Trail Design, Road-to-Trail Conversion, Excavation & Fine Grading

Redding, CA.

- Winter 2018 -


Lyden_Trevor_Destination Shasta

Gateway Phase 2: Trail System Planning

Trail Planning, Design, & Location

Mt. Shasta, CA.

- Fall 2017 -

Photo: Trevor Lyden


Trail Labs Co - Alpine Baldy Trail - Washington

Alpine Baldy Trail: Trail Construction

Trail Location & Design, Road-to-Trail Conversion, Trail Excavation & Fine Grading, Restoration, and Hand Shaping

Skykomish, WA.

- Summer 2016 & Summer 2017 -

A Project of Evergreen Mountain Bike Alliance


Trail Labs Co - Humboldt County - Jump Trail

Jump Line Trail: Maintenance & Upgrades

Trail Design, Excavation & Fine Grading, Hand Shaping, and Restoration

Lacks Creek, CA.

- Spring 2017 -


Trail Labs Co - Lowden Bike Park - Park Planning

Lowden Park: Bike Park Master Plan

Site Assessment, Conceptual Design, Materials & Cost Estimates, Development Plan

Weaverville, CA.

- Spring 2017 -


Rock work.JPG

Enticer Trail: Road-to-Trail Conversion

Planning, Design, Excavation & Fine Grading, Restoration

Redding, CA.

- Winter 2017 -